Parallel Operation of Transformers: The Conditions That Must Match
Adding a second transformer beside an existing one looks like the cheapest route to more capacity. It often is, but only when four conditions line up exactly: turns ratio and tap position, vector group, impedance voltage and phase sequence. Where they do not, the result is not reduced capacity but circulating current flowing between the units before any load is connected, heat that appears with no explanation, and protective devices that operate without a fault. This article sets out each condition, what happens when one of them is not satisfied, and a five-step check for a proposed pairing that can be carried out before energisation.